Protest period begins on Dinosaur Longshore Transmission line

Body

Local residents have until March 19 to review the previously announced and new routes on the 765 kV transmission line Dinosaur-Longshore project following the release of information and maps (see public notice in C and D sections of this week's paper.)

An interactive map of the project can also be viewed at: https:// experience.arcgis.com/experience/ 2a2ca9b3206a4bf bbd1ae875e8abb9d7/ page/Dinosaur_ Longshore Those that wish to object to the plans can issue statements as a protestor (if they live around the route and object) or an intervenor (if the route is planned to go through their property).

The instructions to protest can be found at https://www.puc.texas. gov/consumer-help/ electricity/ transmissionline/ Intervenor forms (which can be filled out online or prined and mailed) can be found at https://ftp.puc. texas. gov/ public/ puctinfo/ industry/ electric/ forms/ccn/Intervene.pdf Docket number for the project is 59315 at www. puc.texas.com Click on central records and filings. Click on search and type in the project number in the control number box. That search will lead to all filings in the project.